LDEO Home
 

 

 

R/V Marcus G. Langseth - Refit completion     

Galveston, July 23 2007     [click on image for full picture]

Fore quarter view Bow view Starboard paravane - Baro 15
Bridge paint complete
Bow View
Baro 15 Paravane in place
Paravane cable
paravane
Winches
Paravane cable
Paravane "legs"
Science winches
Airgun hanger plates
Gun float head
Pneumatic slip rings
Source Hanger plates & Floats
Source Float Head section
Source winch Pneumatic sliprings
Source Floats
Spare Baro-15 paravanes
cable tow floats
spare tow floats
Spare Baro 15 vanes
Cable tow floats
Bird racks
Hydrophone array Streamers on winches
Paravane winch
"bird" racks
Hydrophone cables on winches
Paravane winch with wire
Wet Lab, looking aft
Wet Lab looking forward
Dry lab, sonar electronics
Wet lab, looking aft
Wet lab, looking forward
Dry lab, sonar electronics
Main Port lab
Main Portside lab
Main portside lab
Main deck Portside lab 3 views
Upper portside lab
Upper portside dry lab
Upper portside lab
Upper port side labs - 5 views
Upper port lab
Upper port lab
Seismic lab (1)
Upper port side aft lab
Upper port side forward lab
Seismic lab - back of console
Seismic lab (2) - the console
seismic lab (3)
Seismic lab (4) - conference table
Seismic lab - console & light table
seismic lab
seismic lab - conference table
seismic lab (5) - aft section
rack room (3)
rack room entrance
Seismic lab - aft section
 seismic lab, looking into "rack" room
electronics racks
Rack room (2)
rack room (4)
seismic spares on the dock
rack room, looking forward
some of the electronics storage
Seismic spares on the dock