A nice view of Araihazar - a mustard field a unique characteristic of Bangladesh in the winter time

EM31 conductivity meter and Me - A never ending story

EM31 survey preparation and calibration

A quick lunch break during EM31 survey

Tired goelogists (Moshiur and Wahid) - having a quick nap during EM31 survey break

Abu Taleb - The Boss - supervisor of our local drilling team

Sediment core collections using the local drilling technique known as sludger method

Sediment core samples collected by the push core probe

Sediment core sample in a liner tube

Core samples preservation

Core samples preserved in an anaerobic box

Bored and tired wife :D

Shallow multilevel monitoring wells installation

Shallow multilevel monitoring wells

Shallow multilevel wells monitoring works

Groundwater Sample Collection at site X

River (Old Brahmaputra) Discharge Measurement

Working hard under the sun :)

Relative Elevation Survey - using 500ft long transparent tubes and scale-poles

Elevation Survey - reading water level in the tube

Two strong van drivers (Islam and Shafiq) and the heavvy nitrogen tank

Sediment core collections along the River Meghna

Slug Test - adapted fittings to determine hydraulic conductivity at private tube wells

Bicycle Pump - used during slug test instead of traditional nitrogen gas cylinder

Slug Test - Pressure introduction using a bicycle pump

Slug Test - Pressure release

Having fun with the data collected during slug test