Hydrology BC ENV 3025
Colorado river and dams
-
Map of the
Colorado River Basin
- Glen Canyon Dam
- completed in 1963, after about 7 years of construction. Fig Fig
- in 1980, Lake Powell was completely full, it took long becuase
- it was necessary to maintain water delivery to the lower basin
- water was lost into the local aquifers
- factsheet for Glen Canyon
-
effects of building the Glen Canyon dam:
- loss of spectacular places, see photographs
-
less variability of the discharge rate
-
reduction of floods
-
changes in channel morphology
-
reduced beaches
-
debris jams in tributaries
-
lower temperature of the downstream water
-
lower sediment load -> clearer water
-
increased sediment storage
-
altered riparian vegetation,
-
and declining numbers and quality of spawning grounds for native fish
-
changes in fish population
-
Experimental Flood on the Colorado
River