Hydrology BC ENV 3025
    
    Colorado river and dams
    
      -  Map of the
          Colorado River Basin
- Glen Canyon Dam
 
        - completed in 1963, after about 7 years of construction. Fig,
          Fig
 
        - in 1980, Lake Powell was completely full, it took long
          becuase
 
          -  it was necessary to maintain water delivery to the
            lower basin
- water was lost into the local aquifers
- factsheet
for
            Glen Canyon
 
- effects of building the Glen Canyon dam:
        - loss of spectacular places, see photographs
 
- less variability of the discharge rate
- reduction of floods
- changes in channel morphology
- reduced beaches
- debris jams in tributaries
- lower temperature of the downstream water
- lower sediment load -> clearer water
- increased sediment storage
- altered riparian vegetation,
- and declining numbers and quality of spawning grounds for
          native fish
- changes in fish population
-  Experimental Flood on the
          Colorado
          River