The Orchestration Layer


Why?


  • Scale
  • Economics
  • Methodology (Inverse Problem)











Large and Multiple Scale Problem


  • Distributed by Nature
  • Grand Challenge in Scope
    • Reservoir Controller
    • Ultradeep Gulf of Mexico









Economics


  • Data sets are like treasure maps.
  • Value Recovery
  • Ever increasing capital investments.









Methodology

Ultimate Problem - 4D Ill-Posed Inverse Problem of Multiple Scales



  • Combines analysis and forward modeling. Fusion of multiple forms of data.
  • Multi-Arm Shiva
  • Iterative.
  • Large, multiple scale with different dimensions.
  • Drilling -- critical step in methodology.
  • Gated by scale of computational problem.








Seismic Modeling









Holy Grail -- Match Well Data with Seismic



















Inversion


Salt Modeling (with IBM)


How
(Developmental Areas)


  • Match computing to needs including proper "Big Iron" and networking including satellite.
  • Orchestration Infrastructure -- "Lego" models, distributed databases, distributed model steering.
  • Grand Visualization and "Realization" Nexus.
    • 3D Holographic Display
      (color SpaceGraph.)
  • Quick Look Methodology.
  • Close the loop -- reservoir controller.








New Model of Production Management

Science & Technological Components


  • Integrate distributed talents across service providers and between and within oil and gas producers.
    • Networking, Orchestration Layer, Visualization Nexus.
  • Couple Seismic Scale to Reservoir Scale.
    • Geological Understanding or Reservoir Dynamics.
    • 4D seismic coupled with seismic modeling.








New Model of Production Management

Science & Technological Components (cont)


  • Integrate data covering a wide variety of scales and types:
    • Well Logs
    • Production Data
    • 4D Seismic
    • Model Output
  • Agents and GeoModel Server
  • Instrumentation and Effectors
    • Bottom-placed Seismic
    • Borehole-placed Seismic
    • Well Head Sensors and Effectors








New Model of Production Management

New Business Challenge:


  • Corporate Downsizing.
  • Mega Scale Projects -- Ultradeep Gulf of Mexico.
  • Virtual Enterprise.
  • Transaction-Based Value Recovery, Asset Sharing, and Protection.
  • Collaborative Development.








Other Evidence


An Orchestration Layer for Natural Resource Management


Albert Boulanger
Roger Anderson
Yechiam Yemini (Computer Science & SMARTS)

Approach


Make networking aware of applications with the development of an orchestration layer akin to the orchestration layers developed for multimedia applications.






Back to 4D Story Index
Synopsis of Our Technologies
Synopsis of Business Plan
About Lamont