 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| l |
Purdy letter:
November 26, 2001
|
|
|
| l |
Crow letter:
December 3, 2001
|
|
|
| l |
NSF Submission
deadline: January 24, 2002
|
|
|
| l |
Three proposals
maximum per institution (CU)
|
|
|
|
– |
Instrument
acquisition (max duration 3 years) (max of 2)
|
|
|
– |
Instrument
development (max duration 5 years)
|
|
|
| l |
Size: $100K – $2M
|
|
|
| l |
Cost share
required:
|
|
|
|
– |
Acquisition
proposal: 30% of total
|
|
|
|
– |
Development
proposal: 30% of permanent equipment
|
|