Product: IESX
Version: GeoFrame 3.6
Application: Seis3DV/2DV
Search Type: BugList
Topic:
Single borehole posts multiple times on 2D composite path.
Description:
SYMPTOM: The composite path consists of segments from two perpendicularly
intersecting 2D lines. If the two lines are displayed independently,
the well only posts on one line. The other line is outside the posting
range distance. When posting the well on the composite path the well
is posted twice, once on each line.
Solution:
WORKAROUND: None.
RESOLUTION: Pending.
Last Modified on: 28-JUL-99