Product: IESX
Version: 10.2
Application: DataManager
Search Type: Error
Topic:
Warning: Source and destination survey increments are different.
Description:
Warning: Source and destination survey increments are different, hence
these surveys are incompatible for merging, please select another
set of surveys.
This warning appears immediately while merging interpretation from
one project to another (Either 2D or 3D). The warning indicates that
the CDP increment for the selected (3D) survey or (2D) line in the
destination project does not match that of the source project.
*Another error that may indicate the CDP increments are different is
as follows:
'Routine work merg prog failed'.
Normally this error will have some additional information such as
'no free cache' (See Synopsis 'Routine work merg prog failed'), but
if the additional information box is empty, the error could be an
indication that the CDP increments do not match.
*This error may appear while merging interpretation using multiple
2D lines. There may be one line that has contrasting CDP increments
between the source and destination projects, thus the merge will appear
to work for some time before producing an error.
Solution:
The solution is to change the CDP increment for the survey (3D)
or line (2D) in either the source or destination project.
3D:
1) Open up the DataManager.
2) Click on Seismic > Renumber 3D.
3) Click on the survey being used in the merge, and the
survey's first line, CDP, SP numbers. Their
corresponding increments will appear in the 'Renumber
Parameters' box.
4) Change the CDP increment to match that of the source
project (Renumbering in the destination project) or
destination project (Renumbering in the source project).
5) Click on 'Renumber' and dismiss.
2D:
1) Open up the DataManager.
2) Click on Seismic > Renumber 2D.
3) Click on the necessary survey and 2D line. The selected
survey's trace start and end, SP start and increment, and code
will appear in the middle table.
4) Click on 'CDP' in the 'Table type' box in the upper right corner.
5) Click on the trace range*, in the middle table, and the bottom table will be
populated with the values corresponding to the chosen trace range.
6) Change the CDP increment to match that of the source
project (Renumbering in the destination project) or
destination project (Renumbering in the source project).
7) Click on 'Change' at the bottom of the window.
8) Click on 'Save changes' in the middle of the window.
9) Dismiss and continue the interpretation merge.
*If there are multiple trace ranges, then steps 4-8 will have to
done for each trace range.
Last Modified on: 03-MAY-00