Topic:
Does the Share function overwrite navigation in my interpretation project?
Description:
We have discovered that the navigation (positioning) information in our 2D seismic master project is incorrect and would like to reload it. Will the corrected navigation propagate to the interpretation project when we share?
Solution:
No. The survey navigation information is not copied into the interpretation project if it already exists there. Therefore, it is necessary to unshare the interpretation project, delete the incorrect navigation from both the master and the interpretation project, load the correct navigation to the master and then, reshare. Horizons, contacts and fault cuts will be positioned correctly since they are mapped to an internal reference system that is local to the project. Fault boundaries will need to be corrected since they reference the navigation directly. NOTE: Fault cuts are referenced to XY coordinates when exported to ASCII files.
Last Modified on: 19-MAY-00