Topic:
Can you merge interpretation between GeoFrame 3.8 and GeoFrame 3.7 projects?
Description:
Solution:
Yes. As long as the projects have similar surveys and reference datums, interpretation merge can be performed between GeoFrame 3.8 and GeoFrame 3.7 projects, and vice versa.
Last Modified on: 01-FEB-01