Topic:
How to move a 2d line created from a 3d traverse from one project to another.
Description:
Solution:
Method 1. From the destination project share into the project with the data. DataManager > Seismic > Share the 2D line into the project. Then go to DataManager > Seismic > Copy and copy the data from the shared line into a new class. Method 2. Use SEGY export to write the 2d line to a file. A SEGY file is output. Open the destination project in IESX and load the SEGY file into the desired survey through DataManager > Load seismic. If the two projects do not exist in the same config area then use Method 2.
Last Modified on: 17-MAR-00