Topic:
How to merge three surveys into one survey.
Description:
One survey was loaded in parts into three seperate projects. How do I make it into one survey again? The method below can be used to merge any number of surveys.
Solution:
1. From the final project, share one of the surveys. 2. Copy the seismic data into a new class. 3. Unshare the seimic data. 4. Rename the seismic classes to be merged so that they are the same name in all projects/surveys. 5. Next, use Data Manager => Seismic Merge to merge the seismic. 6. From the other two projects merge those survey/class into the new project. The survey in the new project will automatically be expanded to encompass the entire area. 7. To see the expanded survey on basemap select Post => Surveys to repost.
Last Modified on: 14-SEP-00