Product: IESX

Version: GeoFrame 3.7

Application: DataManager

Search Type: HowTo


Topic:
How to copy just the wells from a borehole set into another project.

Description:
Project A has a total of 6000 wells, and a borehole set contains just 250 of those wells. How to get the borehole set into project B.


Solution:
1. While in Project A, bring up General Data Manager, and open the ITC door icon in the lower right corner of the window. 2. On BaseMap, Post>Boreholes Sets>and select only the borehole set you wish to copy. 3. On Basemap, Send>Boreholes. Click MB3 and toggle Incllusive Polygon on (red). 4. Click MB1 to draw a polygon around all the wells you have posted, click MB3>Break to close the polygon. All the wells should now have changed color to yellow. 5. Click on the ITC broadcast icon on the lower right hand corner of the basemap, the wells highlighted on basemap should now be populated to the General Data Manager. 6. Select File>Data copier in General Data Manager window, choose project B as the target project which the boreholes need to copy to.

Last Modified on: 27-DEC-00