next up previous contents
Next: List of Tables Up: M2001_REP Previous: Contents


List of Figures

  1. Geographical area setting. Topographic and bathymetric data by Sandwell and Smith.
  2. Geographical area setting. The capital letters are the area surveyed during present cruise. The red point is the epicenter of the M7.4 17-aug-1999 Kocaeli earthquake (after www.eeri.org). Heavy and dotted black lines are the NAF locations in its North, Central and South strands (digitized by the MTA map found at www.ifjf.uib.no). Bathymetric data regridded with the digital data of IBCM [13] [12].
  3. Ship tracks.
  4. Ships's tracks, MCS, CHIRP, MULTIBEAM, MAGNETICS
  5. Coring (red) and CTD (blue) stations.
  6. R/V Urania
  7. Instrumental Offsets on R/V Urania
  8. The ELAC 1180 BCC transceiver box.
  9. The ELAC 1180 console.
  10. The ELAC/SEABEAM 1180 Transducers mounted on the frame (built by TAINOX) after recovery in Ravenna
  11. The ELAC/SEABEAM 1180 transducers being recovered in Ravenna by the MC Staff.
  12. The Meridian Surveyor SG-BROWN with ship docked in Ravenna end of the Cruise. The topographically calculated heading was 58 degrees.
  13. The SEA BIRD SBE probe.
  14. Multibeam calibration areas.
  15. T/S diagram of the whole data sample.
  16. Sound Velocity Profiles of the whole data sample.
  17. The Seismic System deployed.
  18. The TELEDYNE streamer. See also the RCL-2 cable leveler.
  19. The SODERA/SSI GI-GUN.
  20. The SODERA/SSI S15 Watergun.
  21. The IGM Gun Synchronizer [4].
  22. The Mod. GSM-19D magnetometer by GEM
  23. The IGM's 1.2Tons. Gravity Corer.
  24. The IGM's Piston Gravity Corer with Free-Fall Trigger.
  25. The NIOZ Piston used on some cores.
  26. The IGM's Sediment/water SW104 corer.
  27. The IGM's Sediment/water SW104 corer.
  28. The IGM's Core cutting equipment.
  29. The OGS's MSCL by GEOTEK.
  30. The ACHILLE ROV.
  31. The ACHILLE ROV.
  32. Work Areas and Multibeam,SBP track lines.
  33. Example of a SEISPRO processed CHIRP line crossing the Bosphorus.
  34. Example of a MCS line run with the 45+45 GI-GUN.
  35. Example of a MCS line run with the S15.
  36. Core logger results from the measurement of one of the collected gravity cores.
  37. Core opened and photographed.
  38. ROV inspection in Golcuk.
  39. ROV inspection in Golcuk.
  40. ROV inspection in Golcuk.
  41. IGM's SEISPRO
  42. Core IM03.
  43. Core IM05.
  44. Core PI40.
  45. Data acquisition in the Imrali-Armutlu area.
  46. Data acquisition in the Tuzla area.
  47. Data acquisition in the Büyükçekmece area.
  48. Data acquisition in the Izmit area.
  49. Data acquisition in the Izmit area.
  50. Data acquisition in the Izmit area.
  51. Data acquisition in the Izmit area (box 1).
  52. Data acquisition in the Izmit area (box 2).
  53. Data acquisition in the Izmit area (box 3).
  54. Data acquisition in the Central Izmit area.
  55. Data acquisition in the Central Izmit area.
  56. Data acquisition in the Central Izmit area.
  57. Data acquisition in the Golcuk area.
  58. Data acquisition in the Ganos area.



2001-07-13